Ambiente
Mainstream Renewable Power and Ocean Winds project awarded its Environmental Impact Assessment for 1.1 GW floating offshore wind farm in South Korea
The EIA comprises the first phase, East Blue Power, of 375 MW and the second phase, KF Wind, of 750 MW. The scope includes 75 turbines and floating foundations, two bottom fixed offshore substations, three submarine export cables of 80 kilometers each, one onshore substation and the onshore high voltage line of 4.5 kilometers until the interconnection point at Korea Electric Power Corporation (KEPCO)'s Shinonsan onshore substation.
Stian Andreassen , Investor Relations, Tel: +47 41 64 31 07,
stian.andreassen@akerhorizons.com
Niamh McGrath , Media, Mainstream Renewable Power, Tel: +353 87 641 6831, niamh.mcgrath@mainstreamrp.com
Mats Ektvedt , Media, Tel: +47 41 42 33 28,
mats.ektvedt@corporatecommunications.no
This information was brought to you by Cision http://news.cision.com
View original content: https://www.prnewswire.co.uk/news-releases/mainstream-renewable-power-and-ocean-winds-project-awarded-its-environmental-impact-assessment-for-1-1-gw-floating-offshore-wind-farm-in-south-korea-302233846.html