Servizi
VINCI - Quarterly Information at 30 September 2024
QUARTERLY INFORMATION AT 30 SEPTEMBER 2024
REVENUE AND OTHER KEY INDICATORS
* Excluding concession subsidiaries' revenue derived from works carried out by non-Group companies (see glossary).
** Period-end.
The changes set out below are relative to the first nine months of 2023 unless otherwise stated.
I. Consolidated key figures
Revenue in the third quarter of 2024 amounted to €18.5 billion, up 1.4% on an actual basis and up 0.3% on a like-for-like basis relative to the third quarter of 2023. In addition to the high base for comparison mentioned in previous quarters, this rate of growth reflects lower inflation in the main countries where the Group operates.
In the first nine months of 2024, consolidated revenue totalled €52.3 billion, an increase of 3.3% (organic growth of 2.5%, a 0.9% positive impact from changes in scope and a negative currency effect of 0.1%).
Order intake in the Energy and Construction businesses totalled €48.4 billion in the first nine months of 2024, a slight increase of 1% supported by good momentum in flow business, particularly in Europe.
The order book rose 6% year on year to reach the high level of €66.8 billion at 30 September 2024. This represents almost 14 months of average business activity in the Energy and Construction businesses. As a result, the Group's visibility on future business levels remains good, allowing it to remain selective when taking on new business. International business made up 68% of the order book, a figure stable since several quarters.
II. Revenue growth by business line
VINCI Autoroutes: €5.0 billion (up 3.6%)
After a good August, traffic levels across all vehicle types were stable in the third quarter as a whole (a 0.1% decline, of which -0.2% for light vehicles and +0.6% for heavy vehicles).
Overall, the decline in VINCI Autoroutes' traffic levels was limited to 0.6% in the first nine months of 2024 (-0.5% for light vehicles and -1.4% for heavy vehicles), despite the protests that blocked motorways in the first half of the year.
VINCI Airports: €3.5 billion (up 15% actual; up 11% like-for-like)
In the third quarter, VINCI Airports' passenger numbers were boosted by strong summer demand and high aircraft load factors, with tourism and VFR (Visiting Friends and Relatives) accounting for the majority of activity at most of the network's airports. In addition to Portugal and Belgrade – where passenger numbers continued to break records – it is worth noting the strong growth seen at recently acquired airports (Edinburgh, Budapest and Cabo Verde). In the United Kingdom, passenger numbers rose above their pre-pandemic levels for the first time. The third quarter also brought a faster recovery in Japan, driven in particular by connections with China.
Overall, VINCI Airports welcomed 240 million passengers to its airports in the first nine months of 2024, 9% more than in the year-earlier period and 2% more than in the first nine months of 2019.
VINCI Highways: €295 million (up 13% actual; up 6% like-for-like)
Northwest Parkway, concessionaire of a tolled section of the Denver ring road (Colorado, United States), became part of VINCI Highways in mid-April 2024.
In other concessions, VINCI Stadium's business levels remained very low because of the Paris 2024 Olympic and Paralympic Games, which occupied the Stade de France until mid-September.
Business trends in the third quarter were broadly similar to those seen in the first half, both within and outside France. VINCI Energies' revenue in the third quarter of 2024 rose by 4.5% relative to the third quarter of 2023. Order intake remained strong, and even accelerated in the third quarter, hitting a new rolling 12-month record of €22 billion. This achievement confirms the excellent position of VINCI Energies' companies in the highly buoyant energy transition and digital transformation markets.
VINCI Energies' decentralised organisation and its acquisition-driven development model are enabling it to make the most of these major trends.
Outside France (58% of the total) , revenue was €8.4 billion, up 6% on an actual basis and up 4.5% on a like-for-like basis. Aside from the positive impact of acquisitions, business growth remained firm in most of VINCI Energies' geographical markets, and was particularly strong in Northern, Central and Eastern Europe.
In France (42% of the total) , revenue was €6.1 billion, up 3% on an actual basis and up 2% on a like-for-like basis. As previously mentioned, that increase reflects a particularly high base for comparison, with very strong business levels in 2023 due to the energy crisis.
Order intake rose by 7% compared with the first nine months of 2023, including a 14% increase in the third quarter. The order book at 30 September 2024 amounted to €16.7 billion (up 14% year on year), representing 10 months of VINCI Energies' average business activity.
Despite a slight decline in the third quarter, Cobra IS posted high revenue for the first nine months of the year, with an overall increase of 5%. Trends varied between regions, with strong growth in Europe (in Spain in particular) but declines in several countries in Latin America. The order book remains at a very high level.
In Spain (50% of the total) , revenue rose sharply by 12% year on year to €2.4 billion, reflecting firm momentum in the Spanish economy.
Outside Spain (50% of the total) , revenue totalled €2.5 billion, slightly down 2% on an actual basis and down 1% on a like-for-like basis. Apart from the impact of Cobra IS's selective policy regarding new business, the slight decrease was due to the phasing of several large EPC projects in Brazil, with the completion of certain works on electricity transmission lines while other contracts are in a start-up phase. Conversely, business levels in Europe (outside Spain) rose sharply, driven by the Dragados Offshore subsidiary.
Order intake fell 18% compared with the outstanding level reached in the first nine months of 2023. That decline was due in particular to the timing of entry into the order book of various offshore energy converter platforms won recently for German operators. The momentum remained well oriented in flow business. The order book at 30 September 2024 amounted to €16.4 billion (up 10% year on year), representing nearly 2.5 years of Cobra IS's average business activity.
VINCI Construction's revenue fell slightly in the third quarter, mainly due to the phasing of certain major projects and lower business levels in Africa. Overall in the first nine months, VINCI Construction's revenue stabilised at a high level. It also saw a sustained volume of new orders.
Outside France (55% of the total) , revenue amounted to €13.0 billion, down 0.5% on an actual basis and down 0.8% on a like-for-like basis. Business levels were buoyant in the United Kingdom, in the Americas and for the Specialty Networks Division (Soletanche Freyssinet). However, they fell for Sogea-Satom in Africa, because of geopolitical instability in some countries on the continent.
In France (45% of the total) , revenue was €10.5 billion, up 2.5% on an actual basis and up 2.3% on a like-for-like basis. Business levels remained firm in roadworks and networks (hydraulic and rail), offsetting the decline in civil engineering caused by the phasing of works on the Grand Paris Express projects. In the building sector, business was driven by rehabilitation projects and by the construction of public buildings, particularly hospitals.
Order intake rose by 4% compared with the first nine months of 2023. It increased in the United Kingdom, Oceania and North America, and for the Specialty Networks Division. In France, order intake rose in roadworks and networks, but fell in the building sector. The order book at 30 September 2024 amounted to €33.7 billion, stable year on year and representing close to 13 months of VINCI Construction's average business activity.
VINCI Immobilier's revenue declined, but the number of housing units reserved increased by 29% to 3,247 in the first nine months of 2024. This improvement was driven by bulk sales to social housing providers.
III. Financial position and liquidity
VINCI's consolidated net financial debt at 30 September 2024 amounted to €22.2 billion. That represents an increase of €6.1 billion relative to 31 December 2023, mainly as a result of acquisitions completed during the period.
VINCI maintained a very high level of liquidity at 30 September 2024, consisting of:
Furthermore, in October 2024, London Gatwick airport issued €750 million of bonds due to mature in October 2033, with an annual coupon of 3.625%. This inaugural euro-denominated bond issue was carried out in the form of sustainability-linked bonds, as a demonstration of the VINCI Airports subsidiary's commitment to reducing its direct and indirect CO emissions.
IV. Other highlights
VINCI has taken note of the Finance Bill for 2025 presented by the French government to the Council of Ministers on 10 October and then tabled before the National Assembly.
Article 11 of the bill provides for an exceptional levy on the profits of large companies in France.
Initial analysis suggests that if the bill were passed in its current form, this exceptional levy would represent an additional tax charge of around €400 million in 2024, which would be paid in 2025.
Patrick Sulliot was appointed Chairman of VINCI Construction on 1 September 2024 and joined the Group's Executive committee.
He was since the start of 2024 Chief Operating Officer of VINCI Construction, in charge of international Proximity Networks (Europe/Africa, United Kingdom and Americas/Oceania) and of digital transformation. Prior to this position, Patrick Sulliot was Chief Executive Officer of VINCI Construction Americas & Oceania, the division bringing together the business line's subsidiaries in the United States, Canada, Chile, Australia and New Zealand.
VINCI Highways
In the third quarter of 2024, the VINCI Concessions subsidiary VINCI Highways announced the following developments:
VINCI Railways
In October 2024, the ownership structure of LISEA – which holds the concession for the South Europe Atlantic high-speed rail line between Tours and Bordeaux – changed after two of its four long-standing shareholders (the infrastructure fund Ardian and CDC) sold a combined 26.2% stake. As VINCI Concessions and Meridiam have both exercised their pre-emption right, VINCI Concessions' stake in LISEA will rise from 33.4% to 42.0%. The transaction values LISEA (equity value at 100%) at €1.9 billion, i.e. 2.4 times the capital initially invested by its shareholders.
VINCI Energies
VINCI Energies has acquired 21 new companies since the start of 2024. They generate combined annual revenue of around €480 million.
The most significant acquisition – completed on 30 September 2024 – was that of Fernao, which is expected to generate pro forma revenue of around €260 million in 2024 and is a leading provider of cybersecurity services in Germany and Switzerland. It will enable VINCI Energies, through its dedicated brand Axians – which generated €3.6 billion of revenue in 38 countries in 2023 – to strengthen and round out its cybersecurity, IT and cloud services expertise in those two countries. These markets, central to digital transformation, are rapidly growing.
Another transaction has been announced in October 2024, and is expected to close by the end of the year. It concerns the acquisition of RH Marine and Bakker Sliedrecht, two Dutch companies specialising in the integration of electrotechnical systems in the maritime sector, with combined revenue of around €160 million in 2023.
V. 2024 guidance
Based on its performance in the first nine months of 2024 and barring events of which it is not currently aware, anticipated trends in the Group's various business lines are as follows in 2024:
As a result, VINCI expects its total revenue to rise again in 2024, although growth is likely to be more limited than in 2023, along with an increase in operating earnings.
As regards 2024 net income, the Group previously stated that it could be close to the level achieved in 2023 after taking into account the new levy on long-distance transport infrastructure operators introduced by the French government, which has been expected at around €280 million.
This guidance regarding net income does not take into account the negative impact of the introduction, currently being reviewed by the French parliament, of a surtax applicable to the French corporate income tax (see page 5 of this press release).
Conference call and financial calendar
The Group will comment on its revenue and business activities in the nine months ended 30 September 2024 in a conference call to be held in English today (Thursday, 24 October 2024) at 18:00 CEST.
To take part, please obtain an individual access code ahead of the call via the following link:
https://register.vevent.com/register/BI8cd1c45d246a409bbabd12999a8db02c
and then dial one of the following numbers:
FR: +33 1 86 47 80 85
UK: +44 1400 220156
US: +1 864 991 4103
*********
**********
About VINCI
VINCI is a global player in concessions, energy and construction, employing 280,000 people in more than 120 countries. We design, finance, build and operate infrastructure and facilities that help improve daily life and mobility for all. Because we believe in all-round performance, above and beyond economic and financial results, we are committed to operating in an environmentally and socially responsible manner. And because our projects are in the public interest, we consider that reaching out to all our stakeholders and engaging in dialogue with them is essential in the conduct of our business activities. VINCI's ambition is to create long-term value for its customers, shareholders, employees, partners and society in general.
www.vinci.com
APPENDICES
APPENDIX A: ADDITIONAL INFORMATION ON CONSOLIDATED REVENUE
Consolidated revenue* in the first nine months of the year – Breakdown by region and business line
* Excluding concession subsidiaries' revenue derived from works carried out by non-Group companies.
** VINCI Railways and VINCI Stadium.
Third quarter consolidated revenue*
* Excluding concession subsidiaries' revenue derived from works carried out by non-Group companies.
** VINCI Railways and VINCI Stadium.
APPENDIX B: VINCI AUTOROUTES AND VINCI AIRPORTS INDICATORS
Traffic on motorway concessions
* Excluding A86 Duplex.
VINCI Autoroutes revenue
VINCI Airports' passenger numbers
Figures at 100% including passenger numbers over the full period.
Edinburgh and Budapest airports joined the VINCI Airports network in June 2024.
APPENDIX C: ORDER BOOK AND ORDER INTAKE
Order book
Order intake
GLOSSARY
Concession subsidiaries' revenue derived from works carried out by non-Group companies: this indicator relates to construction work done by concession companies as programme manager on behalf of concession grantors. Consideration for that work is recognised as an intangible asset or financial asset depending on the accounting model applied to the concession contract, in accordance with IFRIC 12 “Service Concession Arrangements”. It excludes work done by the VINCI Energies, Cobra IS and VINCI Construction business lines.
Like-for-like revenue growth: this indicator measures the change in revenue at constant scope and exchange rates.
Net financial surplus/debt: this corresponds to the difference between financial assets and financial debt. If the assets outweigh the liabilities, the balance represents a net financial surplus, and if the liabilities outweigh the assets, the balance represents net financial debt. Financial debt includes bonds, bank borrowings and debt owed to financial institutions (including derivatives and other liabilities relating to hedging instruments). Financial assets include cash and cash equivalents and assets relating to derivative instruments.
Under IFRS 16, the Group recognises right-of-use assets relating to leased items under non-current assets, along with a liability corresponding to the present value of lease payments still to be made. That liability is not included in net financial surplus/debt as defined by the Group, and is presented directly on the balance sheet.
Order book:
Order intake:
For joint property developments:
VINCI Airports' passenger numbers: this is the number of passengers who have travelled on commercial flights from or to a VINCI Airports airport during a given period, and is a relevant indicator for estimating an airport's revenue from both aviation and non-aviation activities.
VINCI Autoroutes' traffic levels: this is the number of kilometres travelled by light and heavy vehicles on the motorway network managed by VINCI Autoroutes during a given period.
1 See glossary.
2 VINCI Railways and VINCI Stadium.
3 For the record, VINCI's revenue rose by more than 9% in the third quarter of 2023.
4 VINCI Airports acquired a 50.01% stake in Edinburgh airport in late June 2024, and Edinburgh airport has been fully consolidated in the Group's financial statements since 30 June 2024. It contributed €123 million to the Group's revenue in the third quarter of 2024.
5 34 acquisitions were completed by VINCI Energies in 2023 and 21 were completed in the first nine months of 2024. Recent acquisitions outside France boosted revenue by around €135 million in the first nine months of 2024.
6 Including four acquisitions in North America, which contributed almost €90 million to revenue in the first nine months of 2024.
7 The positive impact of sterling's rise against the euro was offset by the euro's rise against other currencies including the US dollar and the Brazilian real.
8 The trend was affected by (i) weather comps, which had a negative impact on light vehicle traffic in September compared with 2023, and (ii) a positive calendar effect for heavy vehicle traffic, as there were two additional business days in the third quarter of 2024 compared with the third quarter of 2023.
9 Figures at 100% including passenger numbers at all managed airports over the full period.
10 Engineering, Procurement and Construction.
11 Around €3.7 billion of contracts to design, build and install offshore windfarm energy converter platforms in the North Sea entered the order book in the first nine months of 2023, as opposed to around €2.5 billion in the first nine months of 2024. The contract with 50Hertz, announced in mid-July 2024, has not yet been added to the order book.
12 Of which, in the third quarter of 2024, the additional payment relating to the 30-year extension to Aerodom's concession contract (Dominican Republic) and the completion of VINCI Energies' acquisition of Fernao.
13 The 2023 tax transparency report has been published by VINCI in July 2024 and is available on its website:
https://www.vinci.com/vinci.nsf/en/transparence_fiscale/$file/vinci-2023-tax-transparency-report.pdf .
14 In partnership with an infrastructure fund operated by Global Infrastructure Partners (GIP), which will own the remaining 49% stake.
15 Of which around €450 million outside France.
16 Figures at 100% including passenger numbers at all managed airports over the full period.
17 Operating income from ordinary activities (Ebit) / revenue.
18 This levy is applicable from 2024, and almost exclusively targets motorway concession companies. France's Constitutional Council has reviewed the levy to clarify whether it is consistent with the French constitution. In its judgment of 12 September 2024, it found that the levy did not contravene the constitution. The VINCI Group and the subsidiaries concerned by the levy have taken note of that judgment and remain determined to ensure that the French state meets its contractual obligations. The disputes are now set to enter a new phase and will be brought before French administrative and European courts.
Attachment
2321 Rosecrans Avenue. Suite 2200